Sec. 48C Qualifying advanced energy project credit
(a) In general. For purposes of section 46, the qualifying advanced energy project credit for any taxable year is an amount equal to 30 percent of the qualified investment for such taxable year with respect to any qualifying advanced energy project of the taxpayer.
(b) Qualified investment.
(1) In general. For purposes of subsection (a), the qualified investment for any taxable year is the basis of eligible property placed in service by the taxpayer during such taxable year which is part of a qualifying advanced energy project.
(2) Certain qualified progress expenditures rules made applicable. Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of this section.
(3) Limitation. The amount which is treated as the qualified investment for all taxable years with respect to any qualifying advanced energy project shall not exceed the amount designated by the Secretary as eligible for the credit under this section.
(c) Definitions.
(1) Qualifying advanced energy project.
(A) In general. The term "qualifying advanced energy project" means a project, any portion of the qualified investment of which is certified by the Secretary under subsection (e) as eligible for a credit under this section --
(i) which re-equips, expands, or establishes an industrial or manufacturing facility for the production or recycling of --
(I) property designed to be used to produce energy from the sun, water, wind, geothermal deposits (within the meaning of section 613(e)(2)), or other renewable resources,
(II) fuel cells, microturbines, or energy storage systems and components,
(III) electric grid modernization equipment or components,
(IV) property designed to capture, remove, use, or sequester carbon oxide emissions,
(V) equipment designed to refine, electrolyze, or blend any fuel, chemical, or product which is --
(aa) renewable, or
(bb) low-carbon and low-emission,
(VI) property designed to produce energy conservation technologies (including residential, commercial, and industrial applications),
(VII) light-, medium-, or heavy-duty electric or fuel cell vehicles, as well as --
(aa) technologies, components, or materials for such vehicles, and
(bb) associated charging or refueling infrastructure,
(VIII) hybrid vehicles with a gross vehicle weight rating of not less than 14,000 pounds, as well as technologies, components, or materials for such vehicles, or
(IX) other advanced energy property designed to reduce greenhouse gas emissions as may be determined by the Secretary,
(ii) which re-equips an industrial or manufacturing facility with equipment designed to reduce greenhouse gas emissions by at least 20 percent through the installation of --
(I) low- or zero-carbon process heat systems,
(II) carbon capture, transport, utilization and storage systems,
(III) energy efficiency and reduction in waste from industrial processes, or
(IV) any other industrial technology designed to reduce greenhouse gas emissions, as determined by the Secretary, or
(iii) which re-equips, expands, or establishes an industrial facility for the processing, refining, or recycling of critical materials (as defined in section 7002(a) of the Energy Act of 2020 (30 U.S.C. 1606(a))[)].
(B) Exception. Such term shall not include any portion of a project for the production of any property which is used in the refining or blending of any transportation fuel (other than renewable fuels).
(2) Eligible property. The term "eligible property" means any property--
(A) which is necessary for --
(i) the production or recycling of property described in clause (i) of paragraph (1)(A),
(ii) re-equipping an industrial or manufacturing facility described in clause (ii) of such paragraph, or
(iii) re-equipping, expanding, or establishing an industrial facility described in clause (iii) of such paragraph,
(B) which is--
(i) tangible personal property, or
(ii) other tangible property (not including a building or its structural components), but only if such property is used as an integral part of the qualified investment credit facility, and
(C) with respect to which depreciation (or amortization in lieu of depreciation) is allowable.
(d) Qualifying advanced energy project program.
(1) Establishment.
(A) In general. Not later than 180 days after the date of enactment of this section, the Secretary, in consultation with the Secretary of Energy, shall establish a qualifying advanced energy project program to consider and award certifications for qualified investments eligible for credits under this section to qualifying advanced energy project sponsors.
(B) Limitation. The total amount of credits that may be allocated under the program shall not exceed $2,300,000,000.
(2) Certification.
(A) Application period. Each applicant for certification under this paragraph shall submit an application containing such information as the Secretary may require during the 2-year period beginning on the date the Secretary establishes the program under paragraph (1).
(B) Time to meet criteria for certification. Each applicant for certification shall have 1 year from the date of acceptance by the Secretary of the application during which to provide to the Secretary evidence that the requirements of the certification have been met.
(C) Period of issuance. An applicant which receives a certification shall have 3 years from the date of issuance of the certification in order to place the project in service and if such project is not placed in service by that time period, then the certification shall no longer be valid.
(3) Selection criteria. In determining which qualifying advanced energy projects to certify under this section, the Secretary--
(A) shall take into consideration only those projects where there is a reasonable expectation of commercial viability, and
(B) shall take into consideration which projects--
(i) will provide the greatest domestic job creation (both direct and indirect) during the credit period,
(ii) will provide the greatest net impact in avoiding or reducing air pollutants or anthropogenic emissions of greenhouse gases,
(iii) have the greatest potential for technological innovation and commercial deployment,
(iv) have the lowest levelized cost of generated or stored energy, or of measured reduction in energy consumption or greenhouse gas emission (based on costs of the full supply chain), and
(v) have the shortest project time from certification to completion.
(4) Review and redistribution.
(A) Review. Not later than 4 years after the date of enactment of this section, the Secretary shall review the credits allocated under this section as of such date.
(B) Redistribution. The Secretary may reallocate credits awarded under this section if the Secretary determines that--
(i) there is an insufficient quantity of qualifying applications for certification pending at the time of the review, or
(ii) any certification made pursuant to paragraph (2) has been revoked pursuant to paragraph (2)(B) because the project subject to the certification has been delayed as a result of third party opposition or litigation to the proposed project.
(C) Reallocation. If the Secretary determines that credits under this section are available for reallocation pursuant to the requirements set forth in paragraph (2), the Secretary is authorized to conduct an additional program for applications for certification.
(5) Disclosure of allocations. The Secretary shall, upon making a certification under this subsection, publicly disclose the identity of the applicant and the amount of the credit with respect to such applicant.
(e) Additional allocations.
(1) In general. Not later than 180 days after the date of enactment of this subsection, the Secretary shall establish a program to consider and award certifications for qualified investments eligible for credits under this section to qualifying advanced energy project sponsors.
(2) Limitation. The total amount of credits which may be allocated under the program established under paragraph (1) shall not exceed $10,000,000,000, of which not greater than $6,000,000,000 may be allocated to qualified investments which are not located within a census tract which --
(A) is described in clause (iii) of section 45(b)(11)(B), and
(B) prior to the date of enactment of this subsection, had no project which received a certification and allocation of credits under subsection (d).
(3) Certifications.
(A) Application requirement. Each applicant for certification under this subsection shall submit an application at such time and containing such information as the Secretary may require.
(B) Time to meet criteria for certification. Each applicant for certification shall have 2 years from the date of acceptance by the Secretary of the application during which to provide to the Secretary evidence that the requirements of the certification have been met.
(C) Period of issuance. An applicant which receives a certification shall have 2 years from the date of issuance of the certification in order to place the project in service and to notify the Secretary that such project has been so placed in service, and if such project is not placed in service by that time period, then the certification shall no longer be valid. If any certification is revoked under this subparagraph, the amount of the limitation under paragraph (2) shall be increased by the amount of the credit with respect to such revoked certification.
(D) Location of project. In the case of an applicant which receives a certification, if the Secretary determines that the project has been placed in service at a location which is materially different than the location specified in the application for such project, the certification shall no longer be valid.
(4) Credit rate conditioned upon wage and apprenticeship requirements.
(A) Base rate. For purposes of allocations under this subsection, the amount of the credit determined under subsection (a) shall be determined by substituting "6 percent" for "30 percent".
(B) Alternative rate. In the case of any project which satisfies the requirements of paragraphs (5)(A) and (6), subparagraph (A) shall not apply.
(5) Prevailing wage requirements.
(A) In general. The requirements described in this subparagraph with respect to a project are that the taxpayer shall ensure that any laborers and mechanics employed by the taxpayer or any contractor or subcontractor in the re-equipping, expansion, or establishment of a manufacturing facility shall be paid wages at rates not less than the prevailing rates for construction, alteration, or repair of a similar character in the locality in which such project is located as most recently determined by the Secretary of Labor, in accordance with subchapter IV of chapter 31 of title 40, United States Code.
(B) Correction and penalty related to failure to satisfy wage requirements. Rules similar to the rules of section 45(b)(7)(B) shall apply.
(6) Apprenticeship requirements. Rules similar to the rules of section 45(b)(8) shall apply.
(7) Disclosure of allocations. The Secretary shall, upon making a certification under this subsection, publicly disclose the identity of the applicant and the amount of the credit with respect to such applicant.
(f) Denial of double benefit. A credit shall not be allowed under this section for any qualified investment for which a credit is allowed under section 48, 48A, 48B, 48E, 45Q, or 45V.